Skip to content

Projects

some of our
past
projects

Safety is paramount in the industry and Urban is diligent in ensuring that all policies are enforced and maintained within the company and on our project sites. Urban is a member CSAO Construction Safety Association of Ontario.

company's safety record

The company’s safety record over its 55 year history is excellent. The work place injury report for the last three years is very positive with minimal lost time incidents. The Urban Mechanical Contracting Ltd. health & safety policy is reviewed annually and the policy conforms to the Ontario Health & Safety guidelines. To date, all relevant and applicable changes have been incorporated.

Projects

Safety is paramount in the industry and Urban is diligent in ensuring that all policies are enforced and maintained within the company and on our project sites. We invite you to view some of our past projects listed below.
commercial building

University of Toronto

This 215,000 sq. ft. building was completed in 2002

This 215,000 sq. ft. building was completed in 2002 It is a facility for electrical and computer engineering, computer science and IT research. The structure contains major laboratories and research areas with a raised floor system for cabling, data and also allowing the customization of heating and ventilation requirements throughout the distribution of this system.

read more…

commercial location

Bay and Dundas Development

In this new 10-storey building, Urban Mechanical’s scope

In this new 10-storey building, Urban Mechanical’s scope of work consisted of new mechanical installation and maintaining two separate systems while meeting the challenge of two different needs for two different tenants. Ryerson needed a large outdoor air requirement and Cadillac Fairview needed constant interior cooling for the retail area. Urban installed pre-coils in the Ryerson air handling units and a connection to free up a cooling heat exchanger that Cadillac would use.

read more…

commercial Ontario

Astra Zeneca Canadian Business Centre

Part of an existing building was demolished and a new

Part of an existing building was demolished and a new 226,042 sq ft 5-storey office addition was constructed to the existing building. The mechanical scope of work consisted of new installations, retrofitting existing systems and maintaining operations without interruptions. The building houses 1,450 employees and features laboratories, manufacturing facilities, clinical research, sales and marketing distribution.

read more…

commercial building

180 Queen St

Completed in the spring of 2006, this 255,000 sq ft…

Completed in the spring of 2006, this 255,000 sq ft. building is LEED Silver certified. Green features include a green roof, low flow water faucets and closets, environmentally friendly paints and recycled content. It is designed not to exceed 30% national energy efficient model. Urban Mechanical installed new mechanical systems.

read more…

commercial building

5750 Explorer Dr

This 106,866 sq ft building was completed in July 2007.

This 106,866 sq ft building was completed in July 2007. The mechanical scope of work consisted of a 5-storey office building designed with compartmentalizedon floor variable air volume air conditioning system with overhead perimeter hot water heating. The building is LEED silver certified.

read more…

commercial location

50 Charlton Ave

All new mechanical installation in new facility which consists of the renovation and expansion of approximately 35,000 s.f. of existing space within Levels 0 and 1 of the existing Mary Grace Wing.

All new mechanical installation in new facility which consists of the renovation and expansion of approximately 35,000 s.f. of existing space within Levels 0 and 1 of the existing Mary Grace Wing. Phase 2 also includes the construction of 3 new levels plus an M&E; penthouse for a total of approximately 70,000 s.f of new construction.

read more…

commercial Ontario

Byron Street

New Mechanical installation for a single storey Data Centre with approx. 188,000 sq.ft. building.

New Mechanical installation for a single storey Data Centre with approx. 188,000 sq.ft. building. The project is Leed Silver certified. HVAC equipments include 4 chillers, 64 CRAC units, 12 AHU, etc.

read more…

commercial building

Centennial College – Scarborough Campus

104,000 sq. ft. 4 storey cmapus, with lecture theatre, stadium seating classrooms, cafe, classrooms, library & administrative offices.

104,000 sq. ft. 4 storey cmapus, with lecture theatre, stadium seating classrooms, cafe, classrooms, library & administrative offices. A bridge connecting the new building with the existing campus.

read more…

1 2 3 4 5

NEED HELP?

For questions, concerns or feedback