5750 Explorer Dr

commercial building

This 106,866 sq ft building was completed in July 2007.

This 106,866 sq ft building was completed in July 2007. The mechanical scope of work consisted of a 5-storey office building designed with compartmentalizedon floor variable air volume air conditioning system with overhead perimeter hot water heating. The building is LEED silver certified.

50 Charlton Ave

commercial location

All new mechanical installation in new facility which consists of the renovation and expansion of approximately 35,000 s.f. of existing space within Levels 0 and 1 of the existing Mary Grace Wing.

All new mechanical installation in new facility which consists of the renovation and expansion of approximately 35,000 s.f. of existing space within Levels 0 and 1 of the existing Mary Grace Wing. Phase 2 also includes the construction of 3 new levels plus an M&E; penthouse for a total of approximately 70,000 s.f of new construction.

Byron Street

commercial Ontario

New Mechanical installation for a single storey Data Centre with approx. 188,000 sq.ft. building.

New Mechanical installation for a single storey Data Centre with approx. 188,000 sq.ft. building. The project is Leed Silver certified. HVAC equipments include 4 chillers, 64 CRAC units, 12 AHU, etc.

Centennial College – Scarborough Campus

commercial building

104,000 sq. ft. 4 storey cmapus, with lecture theatre, stadium seating classrooms, cafe, classrooms, library & administrative offices.

104,000 sq. ft. 4 storey cmapus, with lecture theatre, stadium seating classrooms, cafe, classrooms, library & administrative offices. A bridge connecting the new building with the existing campus.

175 Queens Quay East

commercial building

A new 8 storey 350,000 sq.ft building for health care professional

A new 8 storey 350,000 sq.ft building for health care professional including below grade parking and chiller room on all the above floors. The Building is designed for LEED Gold certification.

2233 Kipling Ave

commercial location

All new mechanical installation in new

All new mechanical installation in new retirement residency facility which consists of the demolition of existing building and building of a new expansion.

Pan Am Aquatics Centre – 1000 Military Trail

commercial Ontario

This new, state of the art Aquatics Centre has been built for the PANAM Games & consist of 2 Olympic swimming pools & 1 diving pool,

This new, state of the art Aquatics Centre has been built for the PANAM Games & consist of 2 Olympic swimming pools & 1 diving pool, a field house, offices & the CSIO area. This was built on a P3 Design Build Finance platform.

Waterpark Place Phase III

commercial building

Development of a 930,000 square foot, 30 storey, class AAA LEED Gold office tower in downtown Toronto.

Development of a 930,000 square foot, 30 storey, class AAA LEED Gold office tower in downtown Toronto. It has over 50,000 square feet of retail services & amenities on the lower floors. On completion, the three-building WaterPark Place complex will contain over 1.7 million square feet.

TTC Sheppard Station (Downsview Park)

commercial building

This Sheppard subway station is a hub link

This Sheppard subway station is a hub link to the Go Metrolinx and forms part of the new TTC Spadina extension comprising of 7 stattions.

Southwest Quadrant Redevelopment Plan

commercial location

A new Leed Gold certified 10 storey office building

A new Leed Gold certified 10 storey office building for the City of Brampton. With a new HVAC system and equipment which includes chillers,boilers, AHU, radiant floor heating, etc.